Repair List, September 2014
- Bottom Job
- Replaced Backing Plate/Spacer Speedometer Through-hull
- Replaced Sea-Cock Saltwater Intake
- Serviced and rebedded Saltwater Intake Through-Hull Fitting
- Repaired 2 Damaged Keel areas (from long line Fishing incident)
- Repaired 2 dozen or so Minor Hull Blisters
- Replaced Missing Engine Intake Screen
- Sanded & Painted Bottom
- Mainsail
- Purchased, Installed & Measured New Dacron Mainsail
- Replaced Headboard Slug New Mainsail
- Winches
- Serviced 4 Major Winches
- Repaired 2 Corroded Winch Bases
- Modified Port Secondary three speed shift lever
- Other Jobs
- Repaired or replaced 4 Bug Screens
- Sewed and Repaired Kevlar Mainsail Delamination at leech below 2nd reef
- Cleaned and waxed Mast Aloft
- Replaced Compass light & Wireing
- Serviced Mercury Motor steering pivot
- Re-Taped 3 Halyards
- Serviced BBQ Gas Control
- Changed Engine oil
- Cleaned and painted 2 Cowl Vents
- Serviced 8 Halyard & Sheet shackles
- Repaired 4 Interior lights
- Repaired Speaker Connection, Stbd Woofer
- Inspected & Serviced Water Heater control valves
- Sewed Torn US Ensign
- Sewed 2 Mexican Courtesy Flags
- Sewed Torn Laundry Bag
- Digitized 6 Nautical Charts for Mexican Coast
- Inspected 2 Rigging Components Aloft
- Installed New gas BBQ
- Replaced Sewing Machine Bobbin Case
- Installed 2 New Water Catchment Pipes
Labels: Boat Work
Quiet Afternoon in Marina Chiapas
Judy at Playa Linda
Judy in the water
Fred at the Beach
Wings
Measuring Mainsail
MGU
Foot of mainsail
Winches Ready for Cleaning
Brush with Gasolene
Judy Sewing Bug Screen
Enrique Lifts Wings
Hull Looks Clean
Power Wash
Rain Halts Work
Enrique
Geraldo & Momo remove Zinc
Painting
Ready for Relaunch
Volcana Tacana from Tapachula Street
Judy at Casa Mexicana
Casa Mexicana
Bar
Tables
Jungle in Courtyard
Pool
Room at Casa Mexicana.jpg)
