Repair List, September 2014
- Bottom Job
- Replaced Backing Plate/Spacer Speedometer Through-hull
- Replaced Sea-Cock Saltwater Intake
- Serviced and rebedded Saltwater Intake Through-Hull Fitting
- Repaired 2 Damaged Keel areas (from long line Fishing incident)
- Repaired 2 dozen or so Minor Hull Blisters
- Replaced Missing Engine Intake Screen
- Sanded & Painted Bottom
- Mainsail
- Purchased, Installed & Measured New Dacron Mainsail
- Replaced Headboard Slug New Mainsail
- Winches
- Serviced 4 Major Winches
- Repaired 2 Corroded Winch Bases
- Modified Port Secondary three speed shift lever
- Other Jobs
- Repaired or replaced 4 Bug Screens
- Sewed and Repaired Kevlar Mainsail Delamination at leech below 2nd reef
- Cleaned and waxed Mast Aloft
- Replaced Compass light & Wireing
- Serviced Mercury Motor steering pivot
- Re-Taped 3 Halyards
- Serviced BBQ Gas Control
- Changed Engine oil
- Cleaned and painted 2 Cowl Vents
- Serviced 8 Halyard & Sheet shackles
- Repaired 4 Interior lights
- Repaired Speaker Connection, Stbd Woofer
- Inspected & Serviced Water Heater control valves
- Sewed Torn US Ensign
- Sewed 2 Mexican Courtesy Flags
- Sewed Torn Laundry Bag
- Digitized 6 Nautical Charts for Mexican Coast
- Inspected 2 Rigging Components Aloft
- Installed New gas BBQ
- Replaced Sewing Machine Bobbin Case
- Installed 2 New Water Catchment Pipes
Labels: Boat Work
0 Comments:
Post a Comment
<< Home